Save Time and Money with Sikla siFramo Prefabricated Solutions
January 31, 2024
Sikla siFramo's weldless, configurable metal framing system is improving the efficiency and flexibility of modular construction. This modular, structural steel system lends itself well to prefabrication, and our latest video guides viewers through the entire prefabrication and installation process, providing a comprehensive understanding of the system.
Sikla offers versatility in creating an array of structures, ranging from pipe racks to large multi-trade racks. Starting with an analysis of your project scope, specifications, and requirements, Unistrut Midwest takes a meticulous approach. Armed with your specific needs, our team collaborates with you to deliver an optimal solution tailored to your project.
Using lightweight, high-tensile strength Sikla beam sections to create the frame, all connections use Sikla’s signature self-formed thread technology, no through bolts, back plates, nuts, or washers required. This fastening technology results in a vibration-proof connection that, when paired with Sikla’s stepless connection, can be applied on all four sides of the siFramo beam at the same point, allowing for three-dimensional builds.
With the frame built, pipes and cable trays are attached to the rack, lifting and installation points are established through deflection engineering, and the completed rack is shipped to your site.
When your Sikla rack arrives on site, no expensive grinding, welding, or hot works permits are needed for installation. Using hand tools, our installation team will have your solution in place and ready to use in a fraction of the time required for a traditional steel structure. All supports and sections are adjustable in the field should changes be needed.
Sikla’s high strength-to-weight ratio allows pipe racks to be built in lengths of 20 to 38 feet, reducing the total number of crane lifts needed for installation. And by leveraging offsite prefabrication, you can significantly reduce the number of on-site manhours needed for installation, with many solutions being installed and ready to use in less than a day.
The speed to market of a prefabricated Sikla support structure is a game changer for projects with tight turnarounds and short timelines. Sikla racks are assembled quickly, often in a third of the time needed for traditional welded steel equivalents. By completing the assembly work off-site in parallel to primary structure construction, your project will often have shorter construction durations and, most importantly, create safe and ergonomic work conditions for laborers.
Be sure to check out the full video to see how the Sikla siFramo rack prefabrication process works. Our team is available to answer any questions.
Sikla siFramo products featured in the video include: